Our scope of work on this contract includes:

  • Removal of existing bathroom, fittings and tiling including waste disposal
  • Supplied and installed new wastes and additional pipework
  • Supplied adhesive grout and white trim
  • laid 21m² of wall tiles
  • Installed shower tray and corner entry closure
  • Installed Mira exposed chrome thermostatic mixer shower
  • Installed bath including taps, end and side panel
  • Installed basin set
  • Installed toilet seat
  • Plastered walls
  • Installed towel rail to new posistion